Content block block-countyoc-page-title
Content block block-countyoc-content
Orange County Releases Annual Crop Report for 2022
Body
The Orange County Agricultural Commissioner’s office released its 2022 Crop Report, which highlights an agricultural industry production value of $86,378,000 throughout the county. FOR IMMEDIATE RELEASE September 7, 2023 Contact: Shannon Widor 714-667-9759 (office) or 714-438-9707 (cell) WHAT Orange County, CA – The Orange County Agricultural Commissioner’s office released its...
Links in this section relate to Body
OC Survey
Body
OC Survey Public Counter County Service Center (CSC), 1st Floor Corner Records Geodetic Parcel, Record of Survey and Tract Maps Right-of-Way Engineering After-Hours Phone Numbers Public roads, flood control channels and public right-of-way areas: (714) 955-0200 Water pollution incidents: 1 (877) 89-SPILL (77455) County of Orange Facility Maintenance: (714) 667-4900...
Orange County Fire Hazard Severity Zones Map
Body
The CA Department of Forestry and Fire Protection released an updated version of the Orange County Fire Hazard Severity Zone map for the unincorporated areas. This map, which uses the latest climate data, fire history, topography, and wildfire modeling to classify areas as Very High, High, or Moderate fire hazard...
Project Complete! East Garden Grove-Wintersburg Channel Improvement Project
Body
NOTICE OF PROJECT COMPLETION EAST GARDEN GROVE-WINTERSBURG CHANNEL IMPROVEMENT PROJECT O C T O B E R 2 0 2 0 — M A R C H 2 0 2 3 Watch our before and after video footage at: ocpublicworks.com/eggw In October 2020, OC Public Works construction crews began work...
Links in this section relate to Body
Project Update: Laguna Canyon Channel Replacement Project (April 2023)
Body
Project Progress 75% Complete! As of March 2023, 780-feet of channel has been completed — that’s 75% of the total project! Other items we’ve checked off our punch-list in Zone 3 near Woodland Drive include: • Drainage structures and reinforced concrete bridge. • Curb and gutter, sidewalk, and decorative fence...
Project Update: Laguna Canyon Channel Replacement Project (March 2023)
Body
Current Project Progress Work Completed to Date As of February, 675 feet of channel replacement has been completed, as well as the drainage structures and the reinforced concrete bridge at Woodland Drive. Other items completed include clearing and grubbing of vegetation, sidewalk, curb and gutter, decorative fencing and fire hydrant...
Reducing Water Runoff and Bacteria Levels to Improve South OC Water Quality
Body
In a presentation at the California Stormwater Quality Association (CASQA) quarterly meeting on July 15, 2021, the OC Stormwater Program shared how data from a number of sources is enabling the measurement of dry weather bacteria load reduction as a result of structural and non-structural (source control) strategies in South...
Links in this section relate to Body
Project Update: East Garden Grove-Wintersburg Channel
Body
CURRENT STATS Construction is 70% complete with an anticipated completion date of December 2022. 20,000 linear feet of sheet piles installed! That’s 100% complete! 7,000 linear feet improved for seismic resilience! (73% complete.) STEEL SHEET PILE FUN FACT The Steel Sheet Piles installed are a marine grade steel, which is...