Content block block-customjs
OC Public Works will perform maintenance repairs along the Santa Ana River Trail to provide smoother surface for trail users.
WHAT
Santa Ana River Trail will remain open during maintenance.
• Work will begin on the existing Santa Ana River Trail between Weir Canyon Rd/La Palma Ave and Lincoln Avenue.
• Work will include removal and replacement of damaged sections of asphalt concrete trail and re-establishing striping and stenciling.
• Traffic control measures such as flag personnel, changeable message signs and extensive delineation of the work area will be present, and moved daily to accommodate the work area.
• Bicycle riders should anticipate needing to walk their bikes around the work sites.
WHEN
Anticipated Construction Duration
January 5, 2026 - February, 2026
Working Days and Hours
Monday - Friday: 7 a.m. - 4 p.m.
* The construction schedule is tentative and subject to change due to weather and other factors.
WHERE
CONTACT INFO
Construction Inspector: Eric Vega (714) 936-5753
Sup. Construction Inspector: Maria Villafana (714) 659-0892